第一章 单元测试

1、单选题:
Smart Grid is the inevitable choice for the development of ( ) and () .
选项:
A:Power Grid Technology; Social economy
B:Science and technology; Natural Environment
C:Power Grid Technology; Natural Environment
D:Power Grid Technology; Natural environment
答案: 【Power Grid Technology; Social economy

2、单选题:
The main technical fields of intelligent power generation are ( ) .
选项:
A:New Energy; Clean Energy; Large Capacity Energy Storage Application
B:Conventional Energy; Renewable Energy; Clean Energy
C:Conventional Energy; Renewable Energy
D:Renewable Energy; New Energy; Large Capacity Energy Storage Application
答案: 【Conventional Energy; Renewable Energy; Clean Energy

3、多选题:
Regarding the research methods of big data, the following statement are ture ( ).
选项:
A:Data collection and multi-source data fusion
B:Interpretation of results
C:Establishment of physical or mathematical models based on mechanisms
D:Build scenario extraction use cases
E:Data Analysis
答案: 【Data collection and multi-source data fusion;
Interpretation of results;
Build scenario extraction use cases;
Data Analysis

4、多选题:
The following statement about big data are true ( ).
选项:
A:Mathematics as the thinking frame of solid system for big data model
B:Mathematics provides a theoretical tool for data processing of big data
C:Big Data is the medium and means of reconciling the human spirit and the physical world
D:Big Data research requires modeling
E:Big Data is suitable for understanding statistical law and chaos law
答案: 【Mathematics as the thinking frame of solid system for big data model;
Mathematics provides a theoretical tool for data processing of big data;
Big Data is the medium and means of reconciling the human spirit and the physical world;
Big Data is suitable for understanding statistical law and chaos law

5、多选题:
Specific Application Directions of power grid development planning include ( ) .
选项:
A:Analysis of influencing factors of power grid reliability
B:Load modeling
C:Data Storage
D:Analysis of electric vehicle charging demand
E:Load forecasting
答案: 【Analysis of influencing factors of power grid reliability;
Load modeling;
Analysis of electric vehicle charging demand;
Load forecasting

第二章 单元测试

1、单选题:
The ultimate goal of smart grid is to build a panoramic real-time system covering the whole production process, including ( ) and other links.
选项:
A:Generation and transmission of electricity, conversion and distribution of electricity, electricity and dispatching of electricity
B:Electricity and dispatching of electricity
C:Generation and transmission of electricity
D:Conversion and distribution of electricity
答案: 【Generation and transmission of electricity, conversion and distribution of electricity, electricity and dispatching of electricity

2、单选题:
Regarding the factors that affect the reliability of the distribution network, the following is true ( ) .
选项:
A:Load level, automation level
B:The level of Operation Management
C:Power Grid structure, equipment quality
D:Power Grid structure, equipment quality, load level, automation level, the level of Operation Management
答案: 【Power Grid structure, equipment quality, load level, automation level, the level of Operation Management

3、单选题:
State Grid Corporation of China began to develop and build enterprise-class big data platform. The Year of the pilot study of big data application was ( ) .
选项:
A:2014
B:2015
C:2016
D:2017
答案: 【2014

4、多选题:
About Smart Grid big data application prospects, the following are true ( ) .
选项:
A:Improving smart grid services to consumers and society
B:Enhancing the capacity of the grid to absorb new energy sources
C:Improving grid security and reliability of power supply
D:Expanding access to grid data
E:Improving the economy of grid operation
答案: 【Improving smart grid services to consumers and society;
Enhancing the capacity of the grid to absorb new energy sources;
Improving grid security and reliability of power supply;
Improving the economy of grid operation

5、多选题:
The challenges to smart grid big data,the following are true ( ) .
选项:
A:Difficulties in obtaining quality data
B:Lack of systematic methodology and industry standard specifications
C:Broad Range of disciplines and high level of technical complexity
D:Research on the method of talent team construction and the need of joint mechanism of tackling key problems
E:There is no consensus on big data
答案: 【Difficulties in obtaining quality data;
Lack of systematic methodology and industry standard specifications;
Broad Range of disciplines and high level of technical complexity;
Research on the method of talent team construction and the need of joint mechanism of tackling key problems;
There is no consensus on big data

发表评论